We carry out 3-D and Virtual Reality modelling in-house, providing innovative constructible designs for our clients.

design & construction

Guidera O’Connor has an in-house team of 3D modellers with specific expertise in the production of Virtual Reality (VR) and Augmented Reality (AR) models

These models are typically produced in the detailed design phase of the project, allowing plant operators and other stakeholders to take a virtual tour of the plant before design is completed. They can walk through the plant, operate equipment and get a feel for the plant in virtual reality.

This technology allows design improvements to be identified and implemented before construction starts, meaning that operators and other stakeholders get what they want.

Watch virtual reality modelling we have done for Albany wastewater treatment plant. See the finished product here.

Watch a flyover of the 3-D model for the Neerabup Water Treatment Plant.

Watch virtual reality modelling we have done for Albany wastewater treatment plant and Neerabup water treatment plant.

Areas we work in:

  • Water Treatment 
  • Media and Membrane Filtration
  • Wastewater Treatment
  • Odour Control and Sludge Handling
  • Stormwater and Wastewater Reuse Schemes
  • Pumping Stations
  • Chemical Dosing and Disinfection
  • Storage tanks and lagoons

We engage specialist design consultants for process and structural engineering, complementing this with our in-house detailed design and drafting team. We also engage specialist suppliers and subcontractors and our construction teams in the design process, providing robust design solutions that are innovative, cost effective and easily constructible.

We have in-house construction and commissioning teams who work solely on water projects, meaning that work proceeds smoothly and efficiently throughout construction, testing and commissioning. Our modern office and excellent working conditions mean that we have low staff turnover and avoid industrial and contractual disputes, minimising costs for our clients.

GO has extensive experience working through design & constructs as well as a range of relationship contracting models. We have delivered numerous projects through Early Contractor Involvement (ECI) as well as Alliance, Target Outturn Cost, Framework Agreements and panel arrangements. A number of projects have also been delivered through successful Joint Venture arrangements.

testimonial

“The Beenyup PEDC Upgrade was a short, intense onsite project, which required meticulous planning over the past 12 months due to the risk profile and the time constraints placed upon the project. The GO project team worked tirelessly over this time to assist in the planning and project execution and I would like to sincerely thank them for their patience, wealth of experience and contribution to delivery of this project.”