We have expertise in the design and construction of water infrastructure.

Waterproofing the West provides a region wide system to harvest, treat and store up to 2400ML of stormwater per annum in specific locations and then distribute non-potable water throughout the western Adelaide region. GO undertook the Early Contractor Involvement (ECI) services followed by a Design and Construct contract for the Mechanical, Electrical and Integrated Communication and Control components of the Project including all structures, process equipment, pipe-work, electrical, instrumentation, controls and SCADA. GO identified significant cost savings during the ECI process and delivered the project ahead of schedule.

“For this Project Guidera O’Connor displayed the behaviours that as a Project Manager you would like to see Contractors exhibit on a contract which, whilst lump sum in nature, required an approach that was relationship based to achieve the outcomes and objectives. They were resourceful, solving issues as they presented themselves and got on with the job with minimal reliance on the Contract to sort out issues and consistently delivered ahead of the advised schedule.” 

Michael Hood  Waterproofing the West Project Manager, Aurecon.