We have expertise in the design and construction of water infrastructure.

Guidera O'Connor was selected to design, manufacture, supply, construct, install, test and commission an upgraded reuse facility with filtration and disinfection modules and a separate chlorine storage building at the Carnarvon Brickhouse Waste Water Treatment Plant. This work included tie-ins to existing pipework adjacent to lagoons, reuse filtration equipment, a chlorine storage and dosing facility, irrigation pump station, lined steel storage tanks and electrical, instrumentation, controls and SCADA.