Guidera O'Connor was selected to design, manufacture, supply, construct, install, test and commission an upgraded reuse facility with filtration and disinfection modules and a separate chlorine storage building at the Carnarvon Brickhouse Waste Water Treatment Plant. This work included tie-ins to existing pipework adjacent to lagoons, reuse filtration equipment, a chlorine storage and dosing facility, irrigation pump station, lined steel storage tanks and electrical, instrumentation, controls and SCADA.