Christies Beach sludge dewatering plant, odour control plant & HV power supply

The Christies Beach WWTP Upgrade Project involved GO delivering one of the critical packages; a new HV power supply for the site as well as dewatering and odour control facilities. Work also included screening of primary sludge using a rotary strain press, sludge transfer, storage and loading conveyor systems, Polymer Dosing Systems and odour control plant including Chemical Scrubber and Activated Carbon Scrubbers. Close communication with both the client and plant operators allowed this project to be completed safely under an accelerated construction schedule.