The sedimentation tanks and mechanical equipment at the Glenelg WWTP were severely deteriorated, and the objective of this project was to rehabilitate them to ensure ongoing serviceability and reliability. The work involved condition assessments, 400m2 of concrete remediation, 2500m2 of concrete protective coating and replacement of sludge scraper chain systems. The quantity of concrete repair required almost doubled during the project and new concrete repair products and methods allowed the work to be completed on schedule with a higher quality finish. The client also congratulated GO on the excellent collaboration with other contractors on site.
“The installation in Tank 4&5 was amongst the best I have ever seen in 25+ years of involvement with the Polychem product.”