We have expertise in the design and construction of water infrastructure.

Hahndorf wastewater treatment plant Inlet works

GO delivered this ECI project for the concept design, design reports and construction costing followed by an AS4300 Design and Construct contract. With tie-ins to the existing plant, GO built a new inlet chamber – raised to improve hydraulics, inlet fine screens with a coarse screen bypass channel and incorporated a grit removal system, screenings and grit handling equipment. A flow splitter box with flow measurement and control was installed, along with a Return Activated Sludge pumping station with mechanical ventilation for corrosion prevention and foul air management. Operational impact was minimised by constructing a unique temporary concrete chamber within the oxidation ditch, allowing new isolation valves to be installed without interrupting plant flows.